Update Date: 2026-08-04
Update Description:
1. Project settings
Coordinate transformation also supports the format of degrees, minutes, and seconds
Add WGS84-UTM Coordinate System
2. Generate terrain
Improve the algorithm for generating terrain boundaries in terrain generation, hill-shading analysis, andterrain analysis
3. Mark available/restricted area
Adjust the logic for marking available/restricted areas, ensuring that circular roads do not need to be interrupted
4. Array layout
When aligned arrays (following terrain), increase the layout capacity
When aligned arrays (not following terrain), the filled arrays are always aligned, increase the layout capacity
Aligning by areas and by specified arrays can be selected together
5. Create road
Optimization of performance for generating slopes and deleting interfering arrays
When selecting an zrea layer for creation, circular roads are supported
6. Pairing half array
Add the legend for unpaired arrays in the upper left corner
7. Combine PV modules into strings
Move the cursor to the unconnected module, and the Legend in the upper left corner will position to the unconnected strings
Improve the fluency of combine operation
8. Electrical connection
Adjust the logic related to the positioning of combine devices
Continuous division mode improvement
9. View cable tool
Improve the calculation logic of 485 cables
10. MV Cable Combine
Significantly optimize the calculation speed of parallel laying of MV cables and when the ampacity correction factor is selected
11. View MV cables
Count the number of cables in each section of the MV route, and calculate the length based on the number of cables (temporarily executed through commands)
12. Export to AutoCAD
Export SLD: Electrical parameters of transformer: CT support on the HV side, supporting up to three groups
The string connection lines and marks are all based on the virtual rectangle
13. Export cable list
Template C adds MV cable and 485 cables, and adds a "Line loss" column
The "Cable depth" verification value range in the Cable list interface is [-10,10]
14. Post coordinate
Create pile position tnterface - Clear Button is added
15. User settings
Cable related 1 - Cable decimal point - value rounding option is added
16. Measure 2D distance and slope
When using the tool, it displays the restricted and shading object range lines
17. Move/copy power blocks
Fix the issue of poor performance in copying results to similar blocks
18. Shading objects
Optimization of performance for setting multiple object shadow ranges as restricted areas
Optimize the effect of planting trees along the boundary, making the space between trees more uniform
19. Synchronize with CAD
Synchronized arrays: When the size of the cad array is inconsistent with that of the su array, the status bar displays the sizes of both
When synchronizing, if the cad arrays or devices are outside the terrain, add a tip
Synchronous PV array/L1 devices/Transformer/electical relationship: When selecting association number (by number), you can choose to identify the number by separator or by digit position
Synchronized PV array/L1 devices/transformers: Add a legend in the upper left corner to enable positioning to the corresponding PV array/device individually
20. Other
When the dongle is expired, not inserted, or the function ID is incorrect, the prompt will no longer pop up repeatedly
Fixed other known bugs